What's Needed?
"
The Ultimate in Simplicity"

A BLOCK JOIST® System installer needs only gloves, a spirit level, a pinch bar, a wide squeegee and a five gallon bucket to follow these five simple steps:
Step 1 Place the joists.
Step 2 Place the concrete blocks between the joists.
Step 3 Pour grout to fill the joists.
Step 4 Dump grout on blocks & spread with a wide squeegee.

"That's all there is to it!"

Masonry contractors are already familiar with the materials, and they can install the system very efficiently. We have 2 types of systems...(click here)