A BLOCK
JOIST® System installer needs only gloves, a spirit level,
a pinch bar, a wide squeegee and a five gallon bucket to follow
these five simple steps: |
|
Step 1 |
Place the
joists. |
|
Step 2 |
Place the
concrete blocks between the joists. |
|
Step 3 |
Pour grout
to fill the joists. |
|
Step 4 |
Dump grout on blocks & spread with a wide squeegee. |
|
|
|
|
"That's
all there is to it!" |
|
|
Masonry
contractors are already familiar with the materials, and they
can install the system very efficiently. We have 2 types of systems...(click here) |